Saskatoon deck planning guide

When does a deck need a permit in Saskatoon?

A homeowner-friendly summary of the City of Saskatoon permit thresholds, application information, and decisions to confirm before deck construction begins.

Reviewed against City of Saskatoon guidance on August 18, 2026

The short answer

The City of Saskatoon currently states that a building permit is required for a deck higher than 200 mm (8 inches) above ground, for a deck larger than 2.32 square metres (25 square feet) and higher than 600 mm (24 inches), or whenever the deck has more than three risers.

Those thresholds are a starting point, not a complete project approval. The property’s zoning, the proposed location, structural details, utility locations, and other applicable requirements still need to be confirmed for the specific project.

What the City asks homeowners to prepare

The City directs applicants to confirm the property’s zoning designation and the development rules that apply to that zoning district.

  • A site plan showing the proposed deck and its distances from property lines and accessory buildings.
  • A drawing showing the location of piles, beams, and columns.
  • Details of any structural changes to the home caused by the proposed deck location.
  • The submission information required by the City’s current Deck Project Guide.

What to have ready for a useful deck estimate

Before requesting an estimate, it helps to have the project address, approximate dimensions and height, the way you want to use the deck, early material preferences, access constraints, and any features you are considering.

PHC uses the estimate and design discussion to clarify scope, practical options, likely permit responsibilities, and the decisions that must be recorded before construction.

Who handles the permit and inspections?

The project agreement should identify whether PHC or the homeowner submits and pays for each required permit. The City determines which inspection stages apply. A permit, inspection, approval, or municipal timeline cannot be guaranteed by a contractor.

The City also instructs property owners and contractors to confirm utility locations before digging and to ensure the work complies with applicable building and zoning requirements.

Projects outside Saskatoon

Saskatoon’s permit thresholds and zoning rules should not be assumed to apply in another municipality. Requirements must be confirmed with the authority responsible for the project location.